Skip to main content
All case studies
Case Studyactive

125 Lake Street

Parking Deck Structural Restoration • White Plains, NY

White Plains, NY 10601· DeRosa Builders Inc.
Multi-Level
Parking Structure
W12x50
New Steel Columns
6"
Reinforced Concrete Deck
Active
Project Status
125 Lake Street
THE CHALLENGE

Parking Deck Structural Restoration

The North Tower parking garage at Stepping Stones Apartments had reached a critical state of deterioration. Aging reinforced concrete slabs, corroded steel beam connections, and compromised structural integrity demanded a comprehensive intervention — not a patch job, but a full structural rebuild of the garage and exterior ramp. DeRosa Builders engaged L&M for the complete structural restoration scope: new W12x50 steel columns with epoxy anchor systems, full concrete deck demolition and replacement with a new 6-inch reinforced slab on composite metal deck, waterproofing membrane systems, and a new asphalt driving surface — every phase coordinated with temporary shoring to maintain structural stability during active demolition.

125 Lake Street overview
THE WORK

Project Overview

A full structural rebuild of a multi-level garage and exterior ramp — steel, concrete, and waterproofing — sequenced around temporary shoring to keep the structure stable throughout.

Scope of Work

New Steel Columns

W12x50 steel columns with custom 1" base plates, leveling nuts, and 3/4" epoxy anchor bolts set into existing footings with non-shrink grout beds

Structural Steel Beams

New steel beams installed per structural plans with bolted and welded connections to existing W36x160 girders and new columns

Concrete Deck Replacement

Sawcut and removal of deteriorated slabs, replaced with new 6-inch reinforced concrete on 1.5-inch composite metal deck with welded wire fabric

Concrete Repair & Crack Injection

Chip and remove deteriorated concrete to expose corroded reinforcing steel; clean, treat, and patch to original profiles. Structural epoxy injection of horizontal cracks

Beam Reinforcement

New 1/2" x 6" stiffener plates and 1" x 9" cap plates welded to existing W36x160 beams at critical load-transfer zones and column connections

Waterproofing System

Full waterproofing membrane applied to the new deck surface to protect against moisture infiltration before the asphalt wearing course

Structural Shoring

Temporary shoring installed before any demolition to maintain stability of the multi-level garage throughout the reconstruction phases

Exterior Ramp Restoration

Complete structural repair of the exterior access ramp matching the garage deck scope — new beams, concrete slab on metal deck, and waterproofing

Asphalt Paving & Finishing

New 2-inch asphalt wearing surface over the waterproofed deck for vehicular traffic with proper slope-to-drain grading

Project Photographs

Concrete Deck Demolition & Structural Shoring
Concrete Deck Demolition & Structural Shoring
New W12x50 Column Installation
New W12x50 Column Installation
Composite Metal Deck Installation
Composite Metal Deck Installation
Epoxy Anchor Bolt Installation
Epoxy Anchor Bolt Installation
Beam Stiffener Plate Welding
Beam Stiffener Plate Welding
Reinforced Concrete Deck Pour
Reinforced Concrete Deck Pour
Exterior Ramp Structural Restoration
Exterior Ramp Structural Restoration
Column Base Plate
Column Base Plate
Welded Connections
Welded Connections
Epoxy Crack Injection
Epoxy Crack Injection
Reinforcing Steel Layout
Reinforcing Steel Layout
Steel Column Base Plate & Foundation Detail
Steel Column Base Plate & Foundation Detail

Have a Similar Project?

Send the project, bid date and documents — our estimating team follows up by the next business day.